How Long Does a Landlord Have to Fix EICR C2 Faults?
Receiving an unsatisfactory Electrical Installation Condition Report (EICR) can throw a spanner in the works for property managers and landlords. When C2 faults appear on your report, quick action becomes necessary. Let’s explore exactly what timeframes apply and how to handle these…
Tell us what you need and we will come back to you the same working day.
NAPIT ApprovedMember 66463
Competent PersonRegistered, electrical
Receiving an unsatisfactory Electrical Installation Condition Report (EICR) can throw a spanner in the works for property managers and landlords. When C2 faults appear on your report, quick action becomes necessary. Let’s explore exactly what timeframes apply and how to handle these potentially dangerous electrical issues properly.

Understanding EICR Fault Classifications
EICRs assess the safety of a property’s fixed electrical installations. When problems arise, they’re categorised by severity:
C1 (Danger Present) – Requires immediate action, posing risk to life or property C2 (Potentially Dangerous) – Urgent attention needed, could become hazardous FI (Further Investigation) – Requires additional testing to determine severity C3 (Improvement Recommended) – Not dangerous but could be upgraded
Any report containing C1, C2 or FI codes is deemed “unsatisfactory” and triggers legal obligations for landlords.
The 28-Day Rule for C2 Faults
For landlords electrical compliance, the law is crystal clear: C2 faults must be remedied within 28 days of the EICR inspection date. This timeframe isn’t optional or flexible – it’s a strict requirement under the Electrical Safety Standards in the Private Rented Sector Regulations.
What many property managers miss is that this 28-day period includes:
- Arranging for a qualified electrician to attend
- Completing all necessary remedial work
- Obtaining proper certification for the repairs
- Distributing documentation to relevant parties
In some cases, the electrical inspector might specify an even shorter timeframe based on their professional judgment of the risks involved.
What Happens After Fixing C2 Faults?
Once repairs are completed, landlords must:
- Obtain written confirmation from the electrician (typically a Minor Electrical Works Certificate for smaller jobs or an Electrical Installation Certificate for larger remedial works)
- Provide this documentation to:
- Current tenants (within 28 days)
- The local housing authority (within 7 days if requested)
- Any prospective new tenants before they occupy the property
Keeping organised records protects you from potential enforcement action and demonstrates your commitment to tenant safety.
Common C2 Faults and Their Implications
C2 faults typically include issues like:
- Missing RCD protection on circuits
- Inadequate earthing arrangements
- Outdated consumer units lacking proper protection
- Improperly installed bathroom lighting
- Damaged sockets or switches with potential shock risks
These faults might not present immediate danger, but they could become hazardous under certain conditions. Bathrooms and kitchens frequently flag C2 issues due to their unique combination of electricity and water exposure.
Penalties for Missing the 28-Day Deadline
Failure to address C2 faults within the required timeframe can result in:
- Financial penalties up to £40,000
- Prohibition notices preventing property rental
- Tenant claims if injuries occur due to electrical faults
- Potential invalidation of property insurance
Local authorities have strong enforcement powers and increasingly prioritise electrical safety compliance inspections.
Finding Help With C2 Fault Remediation
At DH Electrical Services, we specialise in swift remediation of EICR faults across the North West. Our NAPIT-approved electricians understand the pressure landlords face with compliance deadlines.
We prioritise rental property work with clear communication and proper certification. Many letting agents and property management companies trust us for regular electrical testing and remedial work.
Don’t risk non-compliance when dealing with C2 faults. Contact our team on 07936250380 or email [email protected] for prompt assistance with your EICR remedial work needs.
Remember, proper electrical maintenance isn’t just about meeting legal requirements – it protects your investment and ensures tenant safety. Our electricians across the North West region can help ensure your properties remain fully compliant with all electrical safety standards.
What this guide is based on
The standards, rules and job records behind the figures above.
- BS 7671:2018+A2:2022. The wiring regulations every inspection is coded against, so C1, C2 and C3 mean the same thing whoever carries out the test.
- NAPIT scheme rules. What an approved contractor has to hold, record and report, including the certification we issue after every job.
- Our own job records across Liverpool and Merseyside. The figures above come from work we have actually priced and carried out, not from a national average.
Checked on 13 February 2026 by Dave Harvey, NAPIT approved contractor, member 66463. Rules change, so if you are reading this a long way after that date, give us a ring and we will tell you where it stands.
Related reading
How Long Does an EICR Take?
Usually two to four hours for a normal house. But that range hides a lot, and if you are planning a void…
Landlords
Do You Need a New EICR for Every New Tenancy?
This is one of the most common things landlords get wrong, and it costs them money. A tenancy ends, a new one…
Landlords
How to Spot a Fake or Invalid EICR
There is a trade in worthless EICRs, and landlords are the target. Some are outright forgeries. More often they are real documents…
The work behind it
Electrical Inspection & Testing
Full Electrical Installation Condition Reports for landlords, homeowners and businesses, with the certificate issued within 24 hours and remedials priced up front.
Landlord Electricians
EICRs, fire alarm testing and emergency lighting for rented property across Liverpool, booked around your tenants and certified the same week.
Fuseboard Upgrades
Swapping out old rewireable fuses and tired boards for a modern RCBO unit, tested, certified and notified under Part P within 36 hours.







